Register Login

Login

Username
Password
Remember Me

Register

Fields marked with an asterisk (*) are required.
Name
Username
Password
Verify password
Email
Verify email

Font Size

Cpanel

PROJECTS

 

view

Project name

No.

PDF

Site peparation and (civil work)
Nr. Of TWO wells
NC- (186)
Knfra basiin

1

PDF

Site peparation and support (Thee Site Location) :
Owner Eni North Africa -NC (108) Sirt basin (A&B) Abu-tiffle field .

2

PDF

Drilling and Operating Two (Water Well) :NC   (186) kufra basin.

3

PDF

Site preparation and support Services (no. Fight Site Locations under progress) :
Owner Polish Company for oil and Gas Ghadames hasin Area (113) El=Atsham fild.

4

PDF

Well location (Civil Works) :
Period of completion the project 21 Days.

5

PDF

Bakilling (Three) locations drilling well :
Bolck (A1-133/4)
Murzuq basin.

6

PDF

Well location (Civil Woks) and Rig move :
Bolck (151) Murzuq basin.
Period of complction the project two weeks

7

PDF

Civil Work and(Rord constraction) and Airsritp:
Al-atshan (NC-210)

8

PDF

OXY Spection
Kufra basin-Bolck (151)

9

PDF

Al Jouf Al Khaled.
Accommodation

10

PDF

Al jouf Al khaled.
clinic

11

 

 

 

 


مشروعات تطوير الموانئ

 

 

 

صندوق اراء العملاء

نمودج استطلاع رضاء المستفيدين من خدمات المصلحة

تنزيل word

 

 

صندوق الشكاوى

في حالة وجود أي شكوى من قبل العملاء الرجاء التواصل على البريد الألكتروني :

qa.manager@lma.ly

سياسة الجودة

النشرة الشهرية :

ضع بريدك الالكتروني لتصلك آخر التحديثات :